

Because is not an authorized distributor of this product, the Original Manufacturer’s warranty does not apply. The product may have older date codes or be an older series than that available direct from the factory or authorized dealers. is not an authorized surplus dealer or affiliate for the Manufacturer of this product. Rockwell Disclaimer: The product is used surplus. This website is not sanctioned or approved by any manufacturer or tradename listed. Designated trademarks, brand names and brands appearing herein are the property of their respective owners.

Products sold by come with ’s 1-year, 2-year, or 3-year warranty and do not come with the original manufacturer’s warranty. is not an authorized distributor, affiliate, or representative for the brands we carry.

Our licenses are on a server and accessed using FactoryTalk Activation Manager and all the activations are there. I’ve ran into issues with Emulate opening, it takes up to 20 minutes to open. I’ve used the compatibility matrix that Rockwell has but my boss wants to stick with Windows 10 Professional like we do in most our projects but according to the matrix, it looks like having FactoryTalk View SE Enterprise version 10, Studio 5000 Logix version 33 and Studio 5000 Logix Emulate version 33, FactoryTalk Gateway 6.11 and RSLinx 4.11 (mainly for communication to the emulated plc) but in the matrix says Windows 7 and Windows Server 2012 is the best choice. We have plc’s in our rack but they can’t be used because they are being used for other projects. The main reason for this is when we get a project, many times we have to wait for an available plc. Ok, so I was tasked with setting up a virtual for our development team to be able to use to quickly deploy projects hmi, emulated plc, and studio 5000 project together on one virtual.
